Clients Relationship

Hear from Our Partners

Date

Title

November 2015
Replacement of Windows and Doors for the US Department of Veteran Affairs.
June 2015
Replace of Existing Fiberglass Septic Tank with Concrete System for the US Department of Veteran Affairs.
April 2015
Construction of ATM Island and Kiosk for the US Department of Defense.
March 2015
Repair of HVAC System for the US Department of Veteran Affairs.
February 2015
Administration Building Renovation - Install New kiosk Wall Opening for US Department of Veteran Affairs.

Date

Title

August 2014
Pond Shoreline Repair & Erosion Control for the US Department of Veteran Affairs.
July 2014
Hagginwood Park Basketball Court Improvements for the City of Sacramento.
January 2014
Remodeling of Fast and Easy Mart Convenience Store and Fueling Facility in Napa, CA

Date

Title

March 2011
Modification of PEP Auto Store to White Rose Banquet Facility
February 2013
Sacramento Mather Airport Replacement Fuel Farm, Sacramento, CA for the County of Sacramento.

Date

Title

September 2012
Radial Gate Modifications – Chowchilla Canal Bypass Control Structure, Madera County for the State of California Department of Water Resources.
January 2012
Castaic Lagoon Boat Launching Facility for State of California Department of Boating & Waterways.
January 2012
Design-Build Wash Down Facility for Heavy Construction Equipments with Zero Discharge to Sewer and Storm Darin for the US Labor Department. 

Date

Title

July 2011
Installation of 24-strand single-mode fiber-optic in 4-inch conduit between Broadcom to Nokia building on West Bernardo Dr., San Diego.
July 2011
Demolish, dispose and replace water heater at building 27 for the US Coast Guard.
April 2011
Replacement of a Poured-in-Place Playground Resilient Safety Surfacing and Concrete side walk for the US Department of Social  Security Administration.
March 2011
Modification of PEP Auto Store to White Rose Banquet Facility
January 2011
Design & Build Architectural and Engineering Services for the Construction of California Islamic Center, California.
January 2011
Installation of DGPS (Digital Global Positioning System) Tower on Rear Side of Building 544 for the US Coast Guard.

Date

Title

September 2010
Yolo County Capay Park Pedestrian Access Ramp for the Yolo Count
August 2010
Conversion of Existing Bank Building into Commercial Restaurant Building in Sacramento, CA
March 2010
Design and Construction of a Fueling Facility for United Gas & Food in Sacramento, CA.

Date

Title

October 2009
Design & Build Above Ground Fueling Tanks at Merced Fueling Facility for California Department of Transportation (Caltrans)
August 2009
Architect and Engineering Consulting Services for the Construction of Madera Community Center, in Madera, CA.

TSI Engineering, Inc. is an integration of civil engineering and general contracting services. TSI’s strength is based on the 65 plus years of combined experience of its key executives in civil engineering design, structural and geotechnical engineering, construction and construction management.

4600 Roseville Rd. Suite 140
N Highlands, CA 95660